Romero Road Mainline Replacement

As part of the District’s Capital Improvement Program, the existing 8” water main and laterals were replaced with a new 12” water main from Prince Road to Price Street. This will improve fire flow in the area on the westside of Romero Road.

Well Site #75 Improvements

As part of the District’s Capital Improvement Program, the booster manifold has been rebuilt.  The existing welded steel pipe has been replaced with PVC and Ductile Iron pipe.

Well Site #71 Improvements

As part of the District’s Capital Improvement Program, the coating on the water storage tank was inspected on the inside and refinished on the outside.

Well Site #74 Improvements

As part of the District’s Capital Improvement Program, the District’s Well #74 Site has been rebuilt. The existing well was deepened and a liner installed. A new pump, pressure tank and electrical panel were part of the rehabilitation.

Well-Drilling Rig
Under Construction
Preparing the Pump Base
FWID logo
Open Monday – Friday, 8 a.m. to 5 p.m.
3901 North Fairview Avenue
Tucson, AZ 85705
520-887-4192

Serving Our Customers Quality Water Since 1922